Advertisement for orthosearch.org.uk
You currently have no access to view or download this content. Please log in with your institutional or personal account if you should have access to through either of these
The Bone & Joint Journal Logo

Receive monthly Table of Contents alerts from The Bone & Joint Journal

Comprehensive article alerts can be set up and managed through your account settings

View my account settings

Increased one-year risk of symptomatic venous thromboembolism following total hip replacement

A nationwide cohort study



Download PDF

Abstract

We examined the one-year risk of symptomatic venous thromboembolism (VTE) following primary total hip replacement (THR) among Danish patients and a comparison cohort from the general population. From the Danish Hip Arthroplasty Registry we identified all primary THRs performed in Denmark between 1995 and 2010 (n = 85 965). In all, 97% of patients undergoing THR received low-molecular-weight heparin products during hospitalisation. Through the Danish Civil Registration System we sampled a comparison cohort who had not undergone THR from the general population (n = 257 895). Among the patients undergoing THR, the risk of symptomatic VTE was 0.79% between 0 and 90 days after surgery and 0.29% between 91 and 365 days after surgery. In the comparison cohort the corresponding risks were 0.05% and 0.12%, respectively. The adjusted relative risks of symptomatic VTE among patients undergoing THR were 15.84 (95% confidence interval (CI) 13.12 to 19.12) during the first 90 days after surgery and 2.41 (95% CI 2.04 to 2.85) during 91 to 365 days after surgery, compared with the comparison cohort. The relative risk of VTE was elevated irrespective of the gender, age and level of comorbidity at the time of THR.

We concluded that THR was associated with an increased risk of symptomatic VTE up to one year after surgery compared with the general population, although the absolute risk is small.


Correspondence should be sent to Dr A. B. Pedersen; e-mail:

For access options please click here