Advertisement for orthosearch.org.uk
You currently have no access to view or download this content. Please log in with your institutional or personal account if you should have access to through either of these
The Bone & Joint Journal Logo

Receive monthly Table of Contents alerts from The Bone & Joint Journal

Comprehensive article alerts can be set up and managed through your account settings

View my account settings

Upper Limb

The Roper-Tuke total elbow arthroplasty

4- TO 10-YEAR RESULTS OF AN UNCONSTRAINED PROSTHESIS



Download PDF

Abstract

We report the results of a series of 59 unconstrained total arthroplasties of the elbow after a mean follow-up of 6.5 years (4 to 10). All the patients had rheumatoid arthritis. The indication for surgery was pain in all but one. Outcome was assessed by the Mayo Elbow Performance Index (MEPI).

Of the 59 arthroplasties, two were lost to follow-up. Ten patients died, but as two of their arthroplasties were failures we included them in the results. The outcome in the remaining 49 was excellent in 26 (53%), good in 15 (31%), fair in one (2%) and poor or a failure in seven (14%). There was an improvement in the pain score (p < 0.001), movement (p < 0.001) and function (p < 0.001). Two patients developed instability, but neither required further surgery. There was a mean increase of 21° in flexion and of 7° in extension.

The overall rate of complications was 33.9%. Lesions of the ulnar nerve, one of which did not recover, occurred in four patients, deep infection in two and stiffness in five. The rates of complications were similar to those in recent reports of other elbow arthroplasties.

We carried out a radiological analysis of 39 arthroplasties which showed radiolucent lines around the humeral component in 22 and the ulnar component in 15. There were lower scores on the MEPI for those with radiolucent lines around the humeral component.


Correspondence should be sent to Mr O. N. Yanni at Benacre Lodge, Hurst Hill, Hothfield, nr Ashford, Kent TN26 1ER, UK.

For access options please click here