header advert
You currently have no access to view or download this content. Please log in with your institutional or personal account if you should have access to through either of these
The Bone & Joint Journal Logo

Receive monthly Table of Contents alerts from The Bone & Joint Journal

Comprehensive article alerts can be set up and managed through your account settings

View my account settings

Get Access locked padlock

Failure of the cement-bone interface. A consequence of strengthening the cement-prosthesis interface?



Download PDF

Abstract

We report the early failure, at a mean of 37 months, of 17 femoral prostheses due to aseptic loosening at the cement-bone interface. In every case the prosthesis had been manufactured with a surface coating designed to enhance the strength of the cement-prosthesis interface. It is postulated that improving the bond at the cement-prosthesis interface may transfer increased stress to the cement-bone interface and cause early failure at that interface.

For access options please click here