Advertisement for orthosearch.org.uk
Results 1 - 2 of 2
Results per page:
The Journal of Bone & Joint Surgery British Volume
Vol. 86-B, Issue 8 | Pages 1214 - 1219
1 Nov 2004
Jafri AA Green SM Partington PF McCaskie AW Muller SD

Fatigue fractures which originate at stress-concentrating voids located at the implant-cement interface are a potential cause of septic loosening of cemented femoral components. Heating of the component to 44°C is known to reduce the porosity of the cement-prosthesis interface. The temperature of the cement-bone interface was recorded intra-operatively as 32.3°C. A simulated femoral model was devised to study the effect of heating of the component on the implant-cement interface. Heating of the implant and vacuum mixing have a synergistic effect on the porosity of the implant-cement interface, and heating also reverses the gradients of microhardness in the mantle. Heating of the implant also reduces porosity at the interface depending on the temperature. A minimum difference in temperature between the implant and the bone of 3°C was required to produce this effect. The optimal difference was 7°C, representing a balance between maximal reduction of porosity and an increased risk of thermal injury. Using contemporary cementing techniques, heating the implant to 40°C is recommended to produce an optimum effect


The Journal of Bone & Joint Surgery British Volume
Vol. 92-B, Issue 3 | Pages 454 - 460
1 Mar 2010
Baleani M Bialoblocka-Juszczyk E Engels GE Viceconti M

We investigated the effect of pre-heating a femoral component on the porosity and strength of bone cement, with or without vacuum mixing used for total hip replacement.

Cement mantles were moulded in a manner simulating clinical practice for cemented hip replacement. During polymerisation, the temperature was monitored. Specimens of cement extracted from the mantles underwent bending or fatigue tests, and were examined for porosity.

Pre-heating the stem alone significantly increased the mean temperature values measured within the mantle (+14.2°C) (p < 0.001) and reduced the mean curing time (−1.5 min) (p < 0.001). The addition of vacuum mixing modulated the mean rise in the temperature of polymerisation to 11°C and reduced the mean duration of the process by one minute and 50 seconds (p = 0.01 and p < 0.001, respectively). In all cases, the maximum temperature values measured in the mould simulating the femur were < 50°C. The mixing technique and pre-heating the stem slightly increased the static mechanical strength of bone cement. However, the fatigue life of the cement was improved by both vacuum mixing and pre-heating the stem, but was most marked (+ 280°C) when these methods were combined.

Pre-heating the stem appears to be an effective way of improving the quality of the cement mantle, which might enhance the long-term performance of bone cement, especially when combined with vacuum mixing.