Aims. This study aimed to investigate the estimated change in primary and revision arthroplasty rate in the Netherlands and Denmark for hips, knees, and shoulders during the COVID-19 pandemic in 2020 (COVID-period). Additional points of focus included the comparison of patient characteristics and hospital type (2019 vs COVID-period), and the estimated loss of quality-adjusted life years (QALYs) and impact on waiting lists. Methods. All hip, knee, and shoulder arthroplasties (2014 to 2020) from the Dutch Arthroplasty Register, and hip and knee arthroplasties from the Danish Hip and Knee Arthroplasty Registries, were included. The expected number of arthroplasties per month in 2020 was estimated using Poisson regression, taking into account changes in age and sex distribution of the general Dutch/Danish population over time, calculating observed/expected (O/E) ratios. Country-specific proportions of patient characteristics and hospital type were calculated per indication category (osteoarthritis/other elective/acute). Waiting list outcomes including QALYs were estimated by modelling virtual waiting lists including 0%, 5% and 10% extra capacity. Results. During COVID-period, fewer arthroplasties were performed than expected (Netherlands: 20%; Denmark: 5%), with the lowest O/E in April. In the Netherlands, more acute indications were prioritized, resulting in more American Society of Anesthesiologists grade III to IV patients receiving surgery. In both countries, no other patient prioritization was present. Relatively more arthroplasties were performed in
Aims. It is unclear whether mortality outcomes differ for patients undergoing total hip arthroplasty (THA) or total knee arthroplasty (TKA) surgery who are readmitted to the index hospital where their surgery was performed, or to another hospital. Methods. We analyzed linked hospital and death records for residents of New South Wales, Australia, aged ≥ 18 years who had an emergency readmission within 90 days following THA or TKA surgery between 2003 and 2022. Multivariable modelling was used to identify factors associated with non-index readmission and to evaluate associations of readmission destination (non-index vs index) with 90-day and one-year mortality. Results. Of 394,248 joint arthroplasty patients (THA = 149,456; TKA = 244,792), 9.5% (n = 37,431) were readmitted within 90 days, and 53.7% of these were admitted to a non-index hospital. Non-index readmission was more prevalent among patients who underwent surgery in
Aims. The aim of this study was to estimate the 90-day periprosthetic joint infection (PJI) rates following total knee arthroplasty (TKA) and total hip arthroplasty (THA) for osteoarthritis (OA). Methods. This was a data linkage study using the New South Wales (NSW) Admitted Patient Data Collection (APDC) and the Australian Orthopaedic Association National Joint Replacement Registry (AOANJRR), which collect data from all public and
Aims. Antibiotic prophylaxis involving timely administration of appropriately dosed antibiotic is considered effective to reduce the risk of surgical site infection (SSI) after total hip and total knee arthroplasty (THA/TKA). Cephalosporins provide effective prophylaxis, although evidence regarding the optimal timing and dosage of prophylactic antibiotics is inconclusive. The aim of this study is to examine the association between cephalosporin prophylaxis dose, timing, and duration, and the risk of SSI after THA/TKA. Methods. A prospective multicentre cohort study was undertaken in consenting adults with osteoarthritis undergoing elective primary TKA/THA at one of 19 high-volume Australian public/
Aims. To investigate factors that contribute to patient decisions regarding attendance for arthroplasty during the COVID-19 pandemic. Methods. A postal questionnaire was distributed to patients on the waiting list for hip or knee arthroplasty in a single tertiary centre within the UK. Patient factors that may have influenced the decision to attend for arthroplasty, global quality of life (QoL) (EuroQol five-dimension three-level (EQ-5D-3L)), and joint-specific QoL (Oxford Hip or Knee Score) were assessed. Patients were asked at which ‘COVID-alert’ level they would be willing to attend an NHS and a “COVID-light” hospital for arthroplasty. Independent predictors were assessed using multivariate logistic regression. Results. Of 540 distributed questionnaires, 400 (74.1%; 236 awaiting hip arthroplasty, 164 awaiting knee arthroplasty) complete responses were received and included. Less than half (48.2%) were willing to attend for hip or knee arthroplasty while a UK COVID-19 epidemic was in circulation (COVID-alert levels 3 to 5). Patients with worse joint-specific QoL had a preference to proceed with surgery at COVID-alert levels 3 to 5 compared to levels 1 and 2 (hip arthroplasty odds ratio (OR) 1.54 (95% confidence interval (CI) 1.45 to 1.63); knee arthroplasty OR 1.16 (1.07 to 1.26)). The odds of patients with worse joint-specific QoL being willing to attend for surgery at COVID-alert levels 3 to 5 increased further if surgery in a
Data of high quality are critical for the meaningful interpretation of registry information. The National Joint Registry (NJR) was established in 2002 as the result of an unexpectedly high failure rate of a cemented total hip arthroplasty. The NJR began data collection in 2003. In this study we report on the outcomes following the establishment of a formal data quality (DQ) audit process within the NJR, within which each patient episode entry is validated against the hospital unit’s Patient Administration System and vice-versa. This process enables bidirectional validation of every NJR entry and retrospective correction of any errors in the dataset. In 2014/15 baseline average compliance was 92.6% and this increased year-on-year with repeated audit cycles to 96.0% in 2018/19, with 76.4% of units achieving > 95% compliance. Following the closure of the audit cycle, an overall compliance rate of 97.9% was achieved for the 2018/19 period. An automated system was initiated in 2018 to reduce administrative burden and to integrate the DQ process into standard workflows. Our processes and quality improvement results demonstrate that DQ may be implemented successfully at national level, while minimizing the burden on hospitals. Cite this article: