Abstract
Introduction
This study aimed to assess the relationship between preparation times and operative procedures for elective orthopaedic surgery. A clearer understanding of these relationships may facilitate list organisation and thereby contribute to improved operating theatre efficiency.
Methods
Two years of elective orthopaedic theatre data was retrospectively analysed. The hospital medical information unit provided de- identified data for 2015 and 2016 elective orthopaedic cases, from which were selected seven categories of procedures with sufficient numbers to allow further analysis - primary hip and knee replacement, spinal surgery, shoulder surgery (excluding shoulder replacement), knee surgery, foot and ankle surgery (excluding ankle replacement), Dupuytrens surgery and general orthopaedic surgery. The data analysed included patient age, ASA grade, operation, operation time, and preparation time (calculated as the time from the start of the anaesthetic proceedings to the patient's admission to Recovery, with the operating time [skin incision to skin closure] subtracted). Statistical analysis of the data was undertaken.
Results
A total of 1596 procedures performed over the two year period were analysed. Preparation times for the different procedures were assessed, along with the relationship to the procedure complexity. Neither age nor ASA correlated strongly with preparation times. Spine procedures had greater preparation times than hip and knee arthroplasty. Greater uniformity in preparation times for hip and knee arthroplasty was seen across the anaesthetic group than operative times across the surgeon group.
Discussion
Preparation times are just one aspect that may be evaluated with regard to theatre utilisation. This study did not address the theatre turn-over time between cases, which includes transfer of the patient from the admitting/pre-operative area into the theatre.
Conclusion
Preparation times for elective procedures follow a pattern which may be used to inform list planning, with the potential for greater theatre efficiencies with regard to list utilisation and staff allocation.